Customers

Case Studies

EdgeWise cuts Stantec’s modeling time by more than 50%

Stantec was recently involved in a large upgrade to a coal burning power plant in Saskatchewan, Canada in which laser scanning was used to generate an accurate 3D as-built of the existing conditions.
Read more (PDF)...





3D Imaging Services Reduces MEP Workflow on Pharma Project by 60%

3DIS were charged with creating an accurate as-built 3D AutoCAD model of a 3,200 square foot area of a pharmaceutical plant which was being renovated. The model needed to document all walls, doors…
Read more (PDF)...

Scan to BIM with EdgeWise

Thanks to ClearEdge, Ghafari Associates created a Revit model of the one-million square foot Chicago Federal Center under a greatly compressed timeframe. To capture the as-built…
Read more (PDF)...

EdgeWise Delivers a 55% Faster Scan-to-Revit Modeling Workflow

3DIS wanted to streamline the process of converting laser-scanned data into a usable format for 3D modeling, with the goal of reducing overall project time and costs.
Read more (PDF)...

AGE saves 10X on substation model using EdgeWise

AGE was tasked to find a way for their client to measure an “energized” electric substation. The client was required to inspect and confirm the clearances of the steel structures of the substation …
Read more (PDF)...

BRH Achieves 80% Reduction in Modeling of MEP in Medical Office Conversion Project

Bush, Roed & Hitchings, Inc. (BRH) was subcontracted to provide 3D modeling services of The Earl Davie Building, located in Seattle, Washington.
Read more (PDF)...


ClearEdge3D has come through again. The time savings for firms like ours could be substantial.
H. Tate Jones, President, LandAir Surveying, Inc.


EdgeWise Plant 4.0 should be in every pipe modeler’s toolbox…We reduced our 3D modeling time substantially.
Robert Greenhalgh, 3D Data Specialist, Ramboll Oil and Gas


4.0 is a huge step forward for the industry.
Rajesh Boodoo, CEO, 3D Engineering & Support, Ltd.


Edgewise MEP for Revit is a huge step forward in our market. Tasks that used to take us days to complete can now be done in a few hours.
Kelly Cone, LEED AP Innovations Director, Beck Architecture LLC